DWB Timber Engineering

Ancillaries

Ancillaries

Caberdek:
DWB can supply Caberdek 22mm floor decking which can be used in various applications. Caberdek provides a waterproof and slip resistant peel off film which offers a clean finish when removed. With Health and safety now at the foremost of the Building Designers mind Caberdek can provide a safe deck from which to work.

Egger Protect:
DWB can supply Egger Protect 22mm floor decking which can be used in various applications. Egger Protect provides a waterproof and slip resistant top surface which can be left open to the elements for up to 40 days, due to its hard wearing and slip resistant plastic coating. With Health and safety now at the foremost of the Building Designers mind Protect Boards can provide a safe deck from which to work.

Metalwork:
DWB stock a wide range of Trussed Rafter and Open Web specific hangers, straps and fixings. We can also source and supply a wide range of none stock or custom made hangers and metalwork suit most Building Designers requirements. Below is a small selection of the stock that we carry:

  • Masonry hangers in varying depths and widths.
  • Timber to timber hangers in varying widths.
  • Open web hangers in varying widths and depths.
  • Wall plate fixings.

Plywood and OSB boards:
DWB hold stock of 12 & 18mm plywood boards and 11mm OSB boards. We would supply this on request for use as a bracing material on Raised Tie and Attic style roof trusses. By using this method of bracing the erector can eliminate the need for some areas of standard bracing and because of this the need for battening out of the sloping ceiling areas of the Trussed Rafter.

Spandrel Panels:
Spandrel panels are pre-assembled structural panels used as separating walls or external gables, manufactured to the profile of the roof and typically supplied as part of a structural roof package. DWB Timber Engineered spandrel panels are specifically designed and fabricated to compliment our range of engineered products and to replace the need for conventional masonry, which is expensive and time consuming to build in situ. Supplied with built-in lifting straps they are installed alongside the trusses to form a fully compliant dividing wall. If designed to Robust Standard details there will be no need for pre-completion sound testing.